Please use this identifier to cite or link to this item:
http://repository.cinec.edu/handle/cinec20/315
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Chandrasiri, Yasas Sri Abhisheka | |
dc.date.accessioned | 2023-08-26T09:39:28Z | - |
dc.date.available | 2023-08-26T09:39:28Z | - |
dc.date.issued | 2014-12-31 | |
dc.identifier.citation | logistics strategy , holcim lanka limited , handle , planed volume expansion ,Ruhunu cement works | en_US |
dc.identifier.uri | http://localhost/handle/cinec20/315 | - |
dc.description | A case study on realigning outbound logistics strategy holcim lanka limited to handle the planed volume expansion at Ruhunu cement works | en_US |
dc.language.iso | en | en_US |
dc.publisher | Yasas Sri Abhisheka Chandrasiri | en_US |
dc.subject | logistics strategy | en_US |
dc.subject | Ruhunu cement works | en_US |
dc.subject | planed volume expansion | en_US |
dc.subject | handle | en_US |
dc.subject | holcim lanka limited | en_US |
dc.title | A case study on realigning outbound logistics strategy holcim lanka limited to handle the planed volume expansion at Ruhunu cement works | en_US |
dc.type | Article | en_US |
Appears in Collections: | BSc International Transportation Management and Logistics – Old |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
47.pdf | A case study on realigning outbound logistics strategy holcim lanka limited to handle the planed volume expansion at Ruhunu cement works | 326.24 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.