Please use this identifier to cite or link to this item:
http://repository.cinec.edu/handle/cinec20/246| Title: | Ranking of reasons and possible solutions for cost overrun in Sri Lankan construction industry |
| Authors: | Galappaththige, Chamara Kanishka |
| Keywords: | cost overrun construction industry |
| Issue Date: | 31-Dec-2016 |
| Publisher: | Chamara Kanishka Galappaththige |
| Citation: | cost overrun, construction industry |
| Description: | Ranking of reasons and possible solutions for cost overrun in Sri Lankan construction industry |
| URI: | http://localhost/handle/cinec20/246 |
| Appears in Collections: | Bachelor of Engineering (Honors) Civil Engineering - 2016 |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 4.pdf | Ranking of reasons and possible solutions for cost overrun in Sri Lankan construction industry | 285.86 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.